Please activate JavaScript!
Please install Adobe Flash Player, click here for download

FLIPBOOK - Portfolio of Plans

Frnt.Load Washer Frnt.Load Dryer Sink reduced mech. chase Relocated Cold Air Return Scale 1/4”= 1’-0” Kitchen, Bath & Laundry Remodel for residence PAGE: REM-006 REV: 06/14/10 REV: 09/24/10 Date: 04/07/10 Appliance/Plumbing Fixture Requirements - Second Floor Area of Remodel LEGEND 10” exhaust duct Plumbing location - water J G. G. plumbing plumbing plumbing 15 amp 15 amp w. Plumbing location - gas Plumbing area for drains/supplies Duplex, dedicated circuit J-Box, dedicated circuit NOTES 1. Horizontal outlets - position ground on right. 2. All dimensions are from finished drywall. 3. All height locations are AFF, above finished floor, to the center of the box or plumbing opening. C L C L C L 10” 14”28” 12” 12” DryerWasher H/D/C H/D/C Recessed laundry supplies/drain +34” +12” 4”vent 12 15 amp +12” +6” 18” 15” C L C L C L Elevator Linen Bill’s Office To Master Bedroom Suite Stairs - Down Guest Bath Laundry Mirror E.Linen New2868 43” 57” 37” 32” 12”sink R70 A N. Tub/Shower new soap recess 9 5/8” Note: Hold plmb. up high as possible

Overview